Less dig it, will also indirectly affect the height of rockery design.
少挖的话,也会间接影响到假山设计的高度。
In the rockery design and construction details in a time if the error will be reworked.
在假山设计和施工的时候如果在某个细节出现了错误,就要返工。
Note that this is very important, not super dig no less dig, dig it will indirectly affect the height of the rockery design.
注意缛这很重要,不要超挖也不要少挖,超挖的话会间接的影响到假山设计的高度。
应用推荐